DESCRIPTION
A 242 metre Post and Wire Fence was built at a parking bay rest stop on the Eyre Highway. The fence was made from 87 x 125 x 125mm APR Composite fence posts spanning 3 metres with mesh wire and strainers every 1.5metres.
LOCATION
Lincoln Gap, South Australia
CONSTRUCTION
Built By Downer Group | Project completed May 2024.
PROJECT FACTS
1300 kg of reclaimed non-treated timber consumed
1300 kg of recycled plastic consumed
= 33,800 x 2 litre plastic milk bottles
= 125 cubic metres of plastic diverted from landfill
*all figures are approximate